Remodeling & Construction

Bathroom Remodeling in Downey, CA

Tile showers, new vanities and waterproofing done right, from a crew whose tile work you can see in the photos further down this page.

Finished bathroom with glass shower, pebble floor and vanity, bathroom remodeling in Downey, CA

A bathroom remodel is mostly what you cannot see

A bathroom is the smallest room in the house and the hardest on the building. Water, steam and daily use punish every surface, so a remodel that looks good but is not waterproofed behind the tile will fail within a few years. The work that matters most happens before the first tile goes up: a sound substrate, a proper waterproof layer, correct slope toward the drain and a niche or bench that is built into the wall, not stuck onto it.

The photos on this page are from projects like that: green marble-look tile with brass fixtures and a pebble niche, a white double vanity with a tall linen cabinet, a glass shower beside a pebble floor. Each one starts with the same discipline of flat walls, level floors and straight grout lines, which is why a tile bathroom can look as good in ten years as on the day it was finished.

In Downey many bathrooms date to the original construction of the house: a pink or green tub, a small vanity and a window that does not open. Replacing a tub with a walk-in shower, adding a second vanity sink, or fitting a modern shower into the footprint of the old tub are the most common projects we are asked about.

Signs your bathroom needs more than a cosmetic fix

  • Soft, stained or musty spots near the tub. A floor that flexes by the tub or a baseboard that has swollen suggests moisture has been getting behind the surface for some time.
  • Grout and caulk that keep failing. If you re-caulk every year, water is likely moving through a joint or a wall that was never waterproofed properly.
  • A tub nobody uses. Households that only shower often get more from replacing the tub with a walk-in shower than from any other upgrade.
  • One sink for a full household. A double vanity does more for mornings than almost anything else you can put in a bathroom.
  • Outdated tile in colors you can not match. When a chipped tile cannot be replaced because the color is no longer made, re-tiling the area is the real fix.

How we build a bathroom, in order

  1. Plan the layout and pick the finishes

    We confirm what stays and what moves, then settle tile, vanity, shower glass and fixtures. Orders with a long lead time are placed before demolition.

  2. Demolish and check what is behind the walls

    Old tile, tub and vanity come out, and we look at the framing, subfloor and pipes. Water damage and old plumbing show up now, while fixing them is still cheap.

  3. Set the base: framing, pan and waterproofing

    Backer board is installed, the shower pan or floor is sloped to the drain, and the wet areas are waterproofed and tested before any tile is set.

  4. Tile and grout

    Layout lines are snapped so the pattern is centered, niches and benches are tiled around, and the grout is applied once the thinset has cured.

  5. Install vanity, glass and fixtures, then walk it

    The vanity, mirror, glass door and fixtures go in, the room is cleaned and we go through it with you.

What affects the price of a bathroom remodel

A bathroom remodel is a small space with a lot of labor, so the price is driven by decisions rather than square footage alone:

Tile and the amount of it

Large-format porcelain, mosaics and natural stone are all priced and installed differently, and a full-height shower wall uses far more tile than a floor alone.

Moving plumbing

Keeping the toilet, sink and shower where they are is much less costly than relocating drains. Specialty plumbing work is planned at the quote stage.

Shower glass and fixtures

A frameless glass door, a rain head with a handheld and a built-in bench each add cost, but they also change how the room feels.

Hidden damage

If water has been getting into the walls or floor, repairing the framing and subfloor adds to the work before any tile goes in.

Why homeowners call us for bathroom work

Bathroom work is where Rigo’s tile skills and general contractor license come together. The crew handles demolition, framing, tile, flooring, paint and the vanity and fixture install in-house, so one team owns the result from the first hammer swing to the last bead of caulk.

You get a written scope up front. If your project needs plumbing or electrical work that falls under a different license class, such as a relocated drain or a new circuit, we tell you before the work starts and explain how it will be arranged.

Where we do this work

We remodel bathrooms in Downey and the nearby cities, including Bellflower, Norwalk and Paramount. Compact single-story homes in Paramount and South Gate often have one bathroom doing a lot of work, which makes these upgrades especially worthwhile.

Our work

Bathroom projects from our crew

Photos of tile showers, tub surrounds and vanities the crew has built.

FAQ

Bathroom Remodeling questions, answered

Can you turn my bathtub into a walk-in shower?

Yes. It is one of the most common bathroom projects. The tub comes out, the area is rebuilt with a sloped pan and waterproofing, and the walls are tiled. A glass door or curtain finishes it. We check the drain location first because it determines how much work the conversion needs.

How long does a bathroom remodel take?

A typical full bathroom takes a couple of weeks of working time once materials are on site, and longer if there is hidden damage or a permit inspection that needs scheduling. We give you a schedule with the quote.

What does waterproofing involve?

It is a membrane or liquid-applied layer installed behind and under the tile in wet areas, so that water that gets past the grout cannot reach the framing. In a shower it is tested before tile goes on. It is the single most important step in a bathroom and the one most often skipped.

Can you match the tile I found in a store?

Yes. Many customers bring their own tile. Tell us early so we can confirm the quantity, which should include extra for cuts and waste, and check that it suits the walls or floor you have in mind.

Do I have to move out while the bathroom is being remodeled?

Not usually. If it is your only bathroom, we plan with you for the days it is out of service. In many cases the crew can stage the work so the downtime is as short as possible.

Will the new bathroom need a permit?

It depends on the scope. Cosmetic updates generally do not, but changes to plumbing, electrical or structure typically do. We identify that at the start so permits are included in the plan.

Ready for a bathroom you will enjoy using?

Send us photos or have us stop by. We will explain the options, the order of work and what it will cost, in writing.

¿Prefiere español? Llame al (714) 586-3088.

Call NowGet A Free Quote